Feasibility Study of Nickel Mixed Hydroxide Precipitate (MHP) Smelter Construction Plan with High Pressure Acid Leaching (HPAL) Technology
Keywords:
mixed hydroxide precipitate (MHP), financial feasibility, nickel downstreamAbstract
This study evaluates the feasibility of building a nickel Mixed Hydroxide Precipitate (MHP) plant of PT. X with a capacity of 12,000 tons per year. The analysis shows that the potential demand for MHPs in the national and global markets continues to increase, driven by the growth of the nickel battery-based electric vehicle industry. The planned production capacity is projected to be optimally absorbed. The plant is designed using High Pressure Acid Leaching (HPAL) technology that utilizes low-grade nickel ore from multiple locations to reduce dependence on a single mine. Other supporting factors include adequate infrastructure, manpower, regulatory support, and market potential. Raw material requirements per year include 414,000 tons of laterite ore, 148,100 tons of H₂SO₄, 41,700 tons of CaO, and 2,870 tons of MgO. Initial investment (CAPEX) is estimated at $108.8 million with an annual operating expense (OPEX) of $93.5 million. The main equipment includes an autoclave, thickener, filter press, and rotary dryer. Financial analysis shows the project is feasible with a Payback Period of 4.85 years, an IRR of 19% above the MARR of 15%, and a positive NPV of $14.03 million at a discount of 19%. The sensitivity test showed that the project remained viable despite increased operational costs, so it was considered technically and financially prospective to support Indonesia's nickel downstreaming.
References
Gultom, T., & Sianipar, A. (2020). High pressure acid leaching: A newly introduced technology in Indonesia. IOP Conference Series: Earth and Environmental Science, 413(1). https://doi.org/10.1088/1755-1315/413/1/012015
Heijlen, W., Bullock, L., Golev, A., & Werner, T. T. (2024). An empirical estimate of the land footprint of nickel from laterite mining in Indonesia. Resources Policy, 89, 104592. https://doi.org/10.1016/j.resourpol.2024.104592
Ichsan, R. N., Nasution, L., & Sinaga, D. S. (2019). Business Feasibility Study. CV. Manji Medan, 275.
Munawaroh, M., Adzana, Z., Zulhan, Z., Yusro, A., & Hidayat, T. (2022). Temperature Variation on Sulphur Removal from Laterite Nickel Leaching Residue and Iron Extraction. Journal of Waste Resources and Recycling, 4(1), 1–13. Retrieved from www.annexpublishers.com
Heijlen, W., Bullock, L., Golev, A., & Werner, T. T. (2024). An empirical estimate of the land footprint of nickel from laterite mining in Indonesia. Resources Policy, 89, 104592. DOI: 10.1016/j.resourpol.2024.104592
Published
How to Cite
Issue
Section
Copyright (c) 2025 Dewi Santika, Dedy Setyo Oetomo, Haris Sandi Yudha

This work is licensed under a Creative Commons Attribution 4.0 International License.